Liverpool Peel Ports, Alexandra Dock
Alexandra Dock delivers a major port-centric logistics facility in Liverpool, providing a flexible, multi-user warehouse designed to operate within a live dock environment and support high-volume freight, HGV and cargo operations.
Client
Peel Ports
Sector
Industrial & Logistics
Completed
August 2024
Programme
44 weeks
Size
240,000 sq ft
Architect
Chetwoods
Engineer
Fairhust
PM/QS/EA
Peel Ports
About This Project
Project Overview
Alexandra Dock, Liverpool comprises the design and construction of a 240,000 sq ft multi-user industrial warehouse delivered for Peel Ports. Strategically located within an operational dock, the facility was designed to support large-scale storage and port-side logistics operations, with direct access to maritime freight links.
The development includes warehouse and office accommodation supported by a comprehensive infrastructure package to serve HGVs, cranes and cargo vehicles, providing a secure, scalable and fully integrated logistics hub within a high-traffic port environment.
Project Requirements
The client required a flexible, futureproof industrial facility capable of accommodating multiple tenants with varied operational needs. Key requirements included robust yard and loading infrastructure, specialist port-related servicing provisions, secure access arrangements and phased delivery to minimise disruption to ongoing dock operations.
The facility needed to operate safely within a live port setting, maintaining strict security protocols while ensuring efficient vehicle movement and operational continuity.
Glencar’s Role
Glencar was appointed to deliver the project within a live dock environment, coordinating closely with Peel Ports, port authorities, consultants and supply chain partners. The team implemented a carefully phased construction strategy to manage safety, logistics and programme delivery while maintaining uninterrupted port operations.
Scope of Works
Warehouse & Office Accommodation
- Construction of a 240,000 sq ft multi-user industrial warehouse
- Integrated office accommodation to support tenant operations
- High-specification internal finishes designed for durability and adaptability
Infrastructure & Logistics
- Comprehensive infrastructure works to support HGVs, cranes and cargo vehicles
- Loading and servicing areas designed for high-volume port-side logistics
- Weighbridges and specialist yard provisions
External Works & Security
- Secure marshalling areas to manage vehicle movements
- Perimeter fencing and automated barrier systems
- Controlled access points in compliance with port authority regulations
Technical & Delivery Challenges
Delivering a major logistics facility within a live port environment presented significant logistical and safety challenges. The project required close coordination with port authorities, strict control of working zones and vehicle movements, and a phased construction approach to minimise disruption to maritime and freight operations.
The integration of specialist infrastructure alongside the main construction works demanded detailed planning and sequencing to maintain programme integrity and operational safety.
Delivery Conditions Addressed
- Live port and dockside working environment
- High-security operational setting
- Heavy HGV, crane and cargo traffic
- Phased construction delivery
- Multi-tenant operational flexibility
Sustainability & ESG
The warehouse was designed with long-term adaptability and durability in mind, supporting efficient reuse and future retrofit to meet evolving tenant and operational requirements. By delivering a flexible multi-user facility within an existing port estate, the project promotes efficient land use, reduced transport movements and long-term operational resilience within a critical logistics hub.
The Outcome
Alexandra Dock successfully delivers a high-specification, multi-user industrial warehouse fully integrated within Liverpool’s port infrastructure. The facility provides flexible, future-ready logistics accommodation capable of supporting complex maritime operations while maintaining the highest standards of safety, security and operational efficiency.
Alexandra Dock, Liverpool comprises the design and construction of a 240,000 sq ft multi-user industrial warehouse delivered for Peel Ports. Strategically located within an operational dock, the facility was designed to support large-scale storage and port-side logistics operations, with direct access to maritime freight links.
The development includes warehouse and office accommodation supported by a comprehensive infrastructure package to serve HGVs, cranes and cargo vehicles, providing a secure, scalable and fully integrated logistics hub within a high-traffic port environment.
Project Requirements
The client required a flexible, futureproof industrial facility capable of accommodating multiple tenants with varied operational needs. Key requirements included robust yard and loading infrastructure, specialist port-related servicing provisions, secure access arrangements and phased delivery to minimise disruption to ongoing dock operations.
The facility needed to operate safely within a live port setting, maintaining strict security protocols while ensuring efficient vehicle movement and operational continuity.
Glencar’s Role
Glencar was appointed to deliver the project within a live dock environment, coordinating closely with Peel Ports, port authorities, consultants and supply chain partners. The team implemented a carefully phased construction strategy to manage safety, logistics and programme delivery while maintaining uninterrupted port operations.
Scope of Works
Warehouse & Office Accommodation
- Construction of a 240,000 sq ft multi-user industrial warehouse
- Integrated office accommodation to support tenant operations
- High-specification internal finishes designed for durability and adaptability
Infrastructure & Logistics
- Comprehensive infrastructure works to support HGVs, cranes and cargo vehicles
- Loading and servicing areas designed for high-volume port-side logistics
- Weighbridges and specialist yard provisions
External Works & Security
- Secure marshalling areas to manage vehicle movements
- Perimeter fencing and automated barrier systems
- Controlled access points in compliance with port authority regulations
Technical & Delivery Challenges
Delivering a major logistics facility within a live port environment presented significant logistical and safety challenges. The project required close coordination with port authorities, strict control of working zones and vehicle movements, and a phased construction approach to minimise disruption to maritime and freight operations.
The integration of specialist infrastructure alongside the main construction works demanded detailed planning and sequencing to maintain programme integrity and operational safety.
Delivery Conditions Addressed
- Live port and dockside working environment
- High-security operational setting
- Heavy HGV, crane and cargo traffic
- Phased construction delivery
- Multi-tenant operational flexibility
Sustainability & ESG
The warehouse was designed with long-term adaptability and durability in mind, supporting efficient reuse and future retrofit to meet evolving tenant and operational requirements. By delivering a flexible multi-user facility within an existing port estate, the project promotes efficient land use, reduced transport movements and long-term operational resilience within a critical logistics hub.
The Outcome
Alexandra Dock successfully delivers a high-specification, multi-user industrial warehouse fully integrated within Liverpool’s port infrastructure. The facility provides flexible, future-ready logistics accommodation capable of supporting complex maritime operations while maintaining the highest standards of safety, security and operational efficiency.