Coventry DC10 Prologis Park

The refurbishment of DC10 at Prologis Park modernised a 350,000 sq ft industrial facility, enhancing operational efficiency and sustainability through upgraded HVAC systems, LED lighting and EV infrastructure.

Client

Prologis UK

Sector

Industrial & Logistics

Completed

December 2023

Size

350,000 sq ft

Programme

32 weeks

Architect

SGP

Engineer

HDR

About This Project

Project Overview
DC10 at Prologis Park, Coventry involved the comprehensive refurbishment of a 350,000 sq ft industrial and distribution facility, including associated office accommodation. The objective was to modernise the building, enhance operational performance and create a high-quality working environment aligned with contemporary logistics and administrative requirements.

The works formed part of a wider strategy to future-proof the asset, improving energy performance and occupier appeal within a prime industrial location.

Glencar’s Role
Appointed under a Design & Build contract, Glencar was responsible for the full internal and external refurbishment works, managing strip-out, services upgrades and fit-out enhancements across the warehouse and office areas.

Scope of Works
Warehouse & Office Refurbishment
Comprehensive strip-out of existing fixtures and fittings followed by installation of upgraded mechanical and electrical systems across the facility.

Building Services Upgrade
Installation of a fully electric VRF HVAC system serving the office accommodation, improving energy efficiency and environmental performance.

Lighting & Electrical Improvements
Replacement of existing lighting with energy-efficient LED systems throughout the building, alongside upgraded IT and electrical infrastructure.

External Enhancements
Provision of EV parking spaces and associated infrastructure to support low-carbon transport and future occupier requirements.

Sustainability & ESG
The project delivered significant energy efficiency improvements through the introduction of LED lighting and a fully electric VRF HVAC system, contributing to reduced operational carbon and enhanced building performance.

Technical & Delivery Challenges
Delivering refurbishment works within an existing large-scale distribution facility required careful sequencing, coordination of strip-out and installation phases, and robust programme management to achieve completion within the 32-week timeframe.

The Outcome
The completed DC10 refurbishment has transformed the facility into a modern, energy-efficient distribution centre, providing Prologis with a high-quality, future-ready industrial asset positioned to meet evolving occupier demands.