Rochester Rochester M2M

Rochester – M2M is a multi-unit industrial development delivered for Chancerygate, comprising two terraces of modern industrial units with integrated mezzanines and extensive external works to support occupier operations.

Client

Chancerygate (Uxbridge) Ltd

Sector

Industrial & Logistics

Completed

March 2019

Size

41,325 sq ft

Programme

24 Weeks

Architect/Designer

Langley Hall Associates

Engineer

Bradbrook Consulting

QS/Cost Consultant

Academy Consulting

About This Project

Project Overview
The Rochester – M2M project comprised the construction of a new multi-unit industrial development at Maidstone Road, Rochester, Kent. The scheme delivered 11 industrial units arranged across two terraces, providing flexible accommodation suitable for a range of light industrial and logistics occupiers. Each unit was designed to accommodate internal mezzanine space, supporting adaptable operational and storage requirements. The development also included comprehensive external works to serve the units, including access roads, hardstandings, parking provision, drainage and landscaping. The completed scheme provides new industrial accommodation within a strategically located employment area with direct access to the M2 corridor.

Project Requirements
The client required the delivery of a multi-unit industrial development capable of supporting a range of occupier needs, with flexibility in unit layout and the provision of internal mezzanine space. Key objectives included efficient site utilisation across two terraces, robust external infrastructure to support servicing and parking, and coordinated provision of utilities across the development. The scheme needed to incorporate hardstanding, drainage and landscaping works to deliver a fully serviced and operational site. Delivery within a defined programme was required to support the client’s wider development objectives.

Glencar’s Role
Glencar was appointed as main contractor to deliver the construction of the industrial units and associated infrastructure works, coordinating all activities through to completion and handover.

Responsibilities included:
- Overall construction management and site coordination
- Construction of 11 industrial units across two terraces
- Delivery of internal mezzanine structures
- Coordination of utilities and building services
- Management of external works including roads, drainage and landscaping
- Programme, quality and health and safety management

Scope of Works
Enabling Works / Civils & Infrastructure
- Site set-up and enabling activities
- Groundworks and drainage installations
- Utilities provision across the site

Building / Superstructure
- Construction of industrial unit shells
- Formation of two terrace structures
- Installation of mezzanine floors

Fit-Out & Building Services
- Base build internal works to units
- Services provision to individual units
- Mezzanine access and structural elements

External Works & Landscaping
- Access roads and hardstandings
- Car parking areas
- Soft and hard landscaping

Technical & Delivery Challenges
Delivering an 11-unit development across two terraces required careful coordination of sequencing to maintain programme certainty and consistent quality across the scheme. Managing the installation of mezzanine structures within multiple units demanded detailed planning to ensure alignment with base build construction. The provision of shared external infrastructure, including drainage and utilities, required close coordination to support future occupier fit-out without disruption. Working across a large site footprint also introduced logistical challenges associated with access, material deliveries and interface management between trades.

Delivery Conditions Addressed
- Multi-unit industrial development
- Phased construction across multiple terraces
- Shared infrastructure and utilities
- Coordination of mezzanine installations
- Programme-driven delivery

The Outcome
The completed Rochester – M2M development provides 11 modern industrial units within a well-connected employment location. Flexible unit layouts, integrated mezzanine space and comprehensive external infrastructure deliver accommodation suited to a wide range of occupiers. The scheme adds high-quality industrial stock to the local market, supporting long-term use and value for the client.

Graham Langley, Langley Hall Associates

"It was a pleasure working with Glencar on the M2M development in Rochester. Glencar showed a proactive approach to both the design and the build aspects of the design and build contract. Their wealth of experience was evident. Construction works were efficiently programmed and the constrained site was kept very tidy. Glencar suggested many practical details and techniques to improve construction and brought a positive attitude to problem solving. Their attitude to health and safety was excellent.”